P-000 Projects

Selected work.

Development, construction and preconstruction — grouped by the role actually performed. Accuracy is part of how we build trust.

P-100 Development Experience

From opportunity to finished asset.

Three projects where Richard identified the opportunity, structured the economics, guided design and construction, and carried the property through resale — returning 15–17% annualized.

Completed · Sold

7943 Ramsgate

Los Angeles, CA

Property Sourcing · Development · Hands-On Construction · Project Management · Resale

A full-cycle project combining development economics, firsthand building and a disciplined exit. Richard sourced the opportunity, shaped the redevelopment vision with architects and engineers, project-managed execution and personally performed substantial portions of the construction work.

17%Annualized ROIPast project result. Not a projection, guarantee or offer of investment.

Role on this project

  • Sourced the opportunity and evaluated acquisition economics
  • Helped structure the project financially
  • Developed the design vision with architects and engineers
  • Development and project management
  • Performed substantial construction work personally
  • Managed resale to maximize return

Completed · Sold

8218 Barnsley

Los Angeles, CA

Property Sourcing · Development · Direct Construction · Project Management · Resale

Richard identified the property, structured the financial thesis with the investor and created the redesign vision. He coordinated architects and engineers, project-managed the work, performed substantial portions of construction himself, and brought the property back to market.

15%Annualized ROIPast project result. Not a projection, guarantee or offer of investment.

Role on this project

  • Identified the opportunity
  • Structured the financial thesis with the investor
  • Created the construction and redesign vision
  • Coordinated architects and engineers
  • Project-managed execution and built directly
  • Brought the property to market and sold it

Completed · Sold

3407 Devon Way

Redwood City, CA

Property Sourcing · Development Analysis · Design Coordination · Project Management · Realtor Sale

A development case study across the full lifecycle. Richard sourced the property, structured the opportunity with an investor, built the development budget, adapted an existing plan concept and moved it through architecture, engineering and approvals — then represented the finished home at sale.

Richard served in development and project-management roles; STEEL BUILT was not the general contractor on this project.

15%Annualized ROIPast project result. Not a projection, guarantee or offer of investment.

Role on this project

  • Sourced the property and structured it with an investor
  • Financial analysis and development budgeting
  • Adapted an existing residential plan concept
  • Coordinated architecture, engineering and approvals
  • Project management and execution oversight
  • Represented the completed home in resale

P-200 Current Construction

Underway now.

Active STEEL BUILT projects — direct general-contractor responsibility on an occupied multifamily restoration, and preconstruction through steel framing on a new home.

In Progress

San Bruno Walkway Restoration

Huntington, San Bruno, CA

General Contractor · Project Management · Value Engineering · Permitting · SB-721 Compliance

STEEL BUILT is managing the rehabilitation of an elevated exterior walkway serving an occupied six-unit apartment building — taking the work from technical evaluation through engineering, permitting and execution while tenants stay in place.

The project shows the discipline behind every STEEL BUILT job: value-engineer the construction approach, coordinate consultants and trades, and control schedule and cost through a clear, organized process.

Role on this project

  • General contractor and project management
  • Structural engineering coordination
  • SB-721 balcony and walkway compliance
  • Permitting and final inspections
  • Tenant access and occupied-building logistics
  • Waterproofing, guardrail replacement and localized framing repairs

Construction Starting

Roop Road

Gilroy, CA

Preconstruction · Design Support · Value Engineering · Permit Expediting · Steel Framing

A single-story modern ranch home of about 2,000 square feet on an eight-acre property with mountain views — framed in light-gauge steel and designed as a hybrid off-grid home that generates much of its own power.

Richard has worked with this property through two redesigns, from representing the buyer in the purchase through new plans. STEEL BUILT has supported preconstruction, design, value engineering and permitting, and is moving into steel framing and rough construction.

STEEL BUILT's scope covers preconstruction, value engineering, permitting, steel framing and rough construction — not full general-contractor responsibility.

Role on this project

  • Preconstruction and design support through two redesigns
  • Value engineering and structural-system evaluation
  • Permit expediting
  • Light-gauge steel framing
  • Rough-construction scope

P-300 Current Preconstruction

Helping before construction begins.

Builder-led preconstruction and value engineering — organizing the project while the most important decisions can still be changed efficiently.

Active Engagement

Altadena Residence

Altadena, CA

Preconstruction · Project Management · Value Engineering

Richard is helping the owner organize the design process, coordinate the existing designer and consultants, source architectural resources and evaluate design and construction decisions — establishing the organization and cost clarity the project needs before construction.

Role on this project

  • Design-process organization
  • Coordination with the existing designer
  • Sourcing architectural resources
  • Consultant coordination
  • Value engineering and decision evaluation
  • Preparing the project for construction

Planning something similar?

Whether you have a lot, a design in progress or approved plans, we can help define cost, scope and the path to construction.